| Financial Year |
Event |
| 2000-2001 |
GSPL first Pipeline section Hazira - Mora
was commissioned. The section was 36” x 14 kms long. |
| 2001-2002 |
Commissioning of 24” x 45 kms Amboli
- Dahej pipeline. The total length increased to 59 kms. |
| 2002-2003 |
Commissioning of 66 kms of gas pipeline,
which included 12” X 25 Kms Mora - Utran, 24”
x 6.0 Kms Cairn - Mora and 24” x 26 Kms Bhadhut
- Paguthan pipelines, and 12” x 5.0 Kms GNFC, 12”
x 1.0 Km Videocon and 12” x 3.0 Kms Mora - Kribhco
spur lines. The total length increased to 125 kms. |
| 2003-2004 |
Commissioning of 24” x 64 Kms Paguthan
- Baroda pipeline. The total length increased to 209 kms. |
| 2004-2005 |
Commissioning of Baroda – Ahmedabad
- Kalol pipeline, GACL - Petronet pipeline, Mora - Sajod
pipeline and the Kalol - Santej pipeline. The total
grid length increased to 433 kms.
Completion of construction of the Gandhinagar spur
line, which was 15 kms in length. The total grid length
increased to 448 kms.
The Company, GSPC and IDF executed the Share Subscription
and Shareholders Agreement, pursuant to which IDF agreed
to subscribe for equity shares in the Company in an
amount of Rs.900 million.
The company demonstrated the reverse flow capability
for the gas network.
|
| 2005-2006 |
Mora gas terminal which is the hub of
receipt Hazira gas gathering station commissioned.
Commissioned Anklav Dhuvaran, GFL spurline, NTPC kawas
Pipeline projects.
The EPC and engineering contracts for Mora - Vapi,
Anand - Rajkot, Kalol-Himmatnagar, Kalol - Mehsana and
Aanklav - Dhuvaran pipelines are awarded and under execution.
Successful completion of IPO.
|
| 2006-2007 |
Commissioning of Mora Vapi, Anand Rajkot
Pipeline, Kalol Mehsana Pipeline, Kalol Himmatnagar Pipeline
Project. |
| 2007-2008 |
Commissioned Torrent connectivity at Surat,
Padamla-Halol Pipeline, Petronet LNG connectivity. |
| 2008-2009 |
Rajkot - Jamnagar Pipeline on 25.03.2009. |